 
	Laboratory Report LR 309 Settlement behind bridge abutments: performance of a silty clay fill in an approach embankment on the M4 motorway
Publication Year
1970
Document Status
Withdrawn
Abstract
Details an investigation in which the performance of a silty clay fill, placed to complete the approach embankment to one of the abutments of a bridge, was compared directly with the performance of a sandy gravel filling, at the other abutment.
Author
McLaren, D.
Publisher Information
Transport Research Laboratory
The Transport Research Laboratory (TRL) is an internationally recognised organisation providing research, consultancy, testing and certification for all aspects of transport.
							Crowthorne House
							Nine Mile Ride
							
							
							Wokingham
							TRL
							UK
						
							    Website: http://www.trl.co.uk/
    
							    Email: enquiries@trl.co.uk
							    Tel: 01344 773131
						
